Danfoss TripleLynx CN Manual de instalación Pagina 65

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 268
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 64
Connecting the inverters
Ingeteam
Solar-Log
1000/500/200
Installation 65 of 268
Connecting the inverters to each other (Solar-Log
500
, Solar-Log
1000
)
Connect using a network cable (patch cable)
Where to connect: RJ45 sockets on the bottom of the inverter
Procedure
1 Insert the RJ45 plug into any RJ45 socket on inverter 1.
2 Insert the other end of the wire into any RJ45 socket on inverter 2.
3 Connect the other inverters to each other in the same way.
4 Terminate in the last inverter in accordance with the inverter instructions.
4.25 Ingeteam
Overview
Interface not integrated. Retrofit RS485 interface card.
3 pin wiring
Communication address must be allocated.
Work steps
Switch off the inverters and the SolarLog™; Page 17
Install the RS485 interface in the inverter
Connect inverters to the Solar-Log
Connect the inverters to each other
Allocate communication address
Installing the RS485 interface
In the 8-pin connection socket, insert the appropriate plug (Phoenix plug type:
FKCT 2.5/8-ST) with RS485 wiring.
Procedure
Install the RS485 interface in the inverter in accordance with the interface
card installation instructions.
Connect inverters to the Solar-Log
The wiring is done using the
self-made, shielded 3 wire data cable and terminal block connector
( Page 15).
Vista de pagina 64
1 2 ... 60 61 62 63 64 65 66 67 68 69 70 ... 267 268

Comentarios a estos manuales

Sin comentarios