Danfoss TripleLynx CN Manual de instalación Pagina 109

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 268
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 108
Connecting the inverters
Siemens
Solar-Log
1000/500/200
Installation 109 of 268
Connecting the inverters to each other (Solar-Log
500
, Solar-Log
1000
)
Connection using your own fabricated daisy chain cable.
Where to connect: X2 connection socket on outside of the inverter.
Procedure
1 Insert the plug into socket X2 on inverter 1.
2 Insert the other end of the wire into the X2 socket on inverter 2.
3 Connect the other inverters to each other in the same way.
4 Terminate in the last inverter in accordance with the inverter instructions.
Allocating communication address
Recommendation: Continuous numbering starting with 1.
Default settings on the inverter: Communication address 1
Setting: Using the inverter operating display
Notes
From the Communication/RS485 menu select Address for ProLog
From the Communication menu set Protocol type COM 1 to 9.
Procedure: As set out in the inverter's instructions
4.52 Siemens
Overview
Interface integrated
Where to connect: RS485 socket on the bottom of the inverter
2 pin wiring
Communication address must be allocated.
Work steps
Switch off the inverters and the SolarLog™; ( Page 17)
Connect inverters to the Solar Log
Connect the inverters to each other
Allocate communication address
Connecting inverters to the Solar-Log™
To connect the Solar-Log™ and the inverters prepare cables with the follow-
ing pin allocation.
Vista de pagina 108
1 2 ... 104 105 106 107 108 109 110 111 112 113 114 ... 267 268

Comentarios a estos manuales

Sin comentarios