Danfoss TripleLynx CN Manual de instalación Pagina 55

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 268
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 54
Connecting the inverters
Mastervolt (RS485)
Solar-Log
1000/500/200
Installation 55 of 268
Procedure
1 If you are fabricating the cable yourself, connect the wires as shown in the
following diagram:
Solar-Log™ terminal block connector
RJ45 inverter
Terminal
Pin
1
4
4
3
2 Insert the RJ45 plug into the RJ45 socket on the inverter.
3 If only one inverter is to be connected terminate this in accordance with the
inverter instructions.
4 Insert the terminal block connector into the Solar-Log™ RS485 socket.
Connecting the inverters to each other (Solar-Log
500
, Solar-Log
1000
)
Connect using a network cable (patch cable)
Where to connect: RJ45 plug outside the housing floor
Procedure
1 Insert the RJ45 plug into any RJ45 socket on inverter 1.
2 Insert the other end of the wire into any RJ45 socket on inverter 2.
3 Connect the other inverters to each other in the same way.
4 Terminate in the last inverter in accordance with the inverter instructions.
Vista de pagina 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 267 268

Comentarios a estos manuales

Sin comentarios