Illustration 2.4: Step 3 of 7: Time and Date
To change these settings later, refer to
Setup, Inverter details, Set Date and Time
.
Step 4 of 7: Installed power
For each PV input, enter
surface area
installed power
Incorrect setting can have serious consequences for production efficiency.
Illustration 2.5: Step 4 of 7: Installed Power
To change the installed power, refer to
Setup, Calibration, PV Array
.
2. Getting Started
10 L00410583-01_02