
42 User Guide DLX Series L00410623-1
If the inverter is configured as master: step through and set the feeding phase (L1, L2, L3,
L1-L2, L1-L3, or L2-L3 as required) for all follower inverters.
9. Plant Apparent Power
Plant apparent power is used to determining certain VDE 4105 default settings. The value
shown in the installation menu is a suggestion and must be confirmed. Please call up the
digits and change values if required before pressing Enter.
Enter – Call up the digits
Up – Increase present digit
Down – Decrease present digit
Enter – Confirm
Left – Back
Right – Next
Enter – Confirm
10. Grid Code
Enter – Call up the list of grid codes
Up or Down – Scroll through the list to select
the required grid code for the actual installation
site:
Enter – Confirm
Left – Back
Right – Next
Enter – Confirm
Comentarios a estos manuales